Short answer

Around 4:1 sand to cement for general brickwork, 3:1 for exposed or below-ground work, and a lime mix for anything historic. Mix dry first, add water gradually, and aim for a consistency that holds a ridge without slumping.

Mortar strength is a matter of matching the wall, not of making it as strong as possible — a mix that is too hard damages old brickwork.

Safety

Cement is strongly alkaline and causes serious chemical burns on prolonged skin contact — wear waterproof gloves, long sleeves and eye protection, and wash any splashes off immediately. Dry cement dust contains crystalline silica and should not be inhaled; wear a mask when handling the powder. Never kneel in wet mortar.

What you'll need

  • Building sand and cement, or a bagged pre-mix
  • A mixing board or tub, and a shovel
  • Waterproof gloves and eye protection

Step by step

  1. Choose the ratio for the job.4:1 sand to cement for general above-ground brickwork. 3:1 for chimneys, copings and exposed positions. 5:1 or 6:1 with added lime for soft old brick.
  2. Use a weaker mix on old buildings.Mortar must be weaker than the brick, so moisture and movement are taken by the joint rather than the brick face. Cement pointing on soft Victorian brick causes the brick faces to spall off.
  3. Consider lime for pre-1919 walls.Lime mortar is flexible and breathable and is the correct material for solid-wall historic construction. It is a different technique and worth reading about specifically.
  4. Use the right sand.Soft building sand for bricklaying and pointing. Sharp sand for screeds and concrete. Using sharp sand for pointing gives a harsh unworkable mix.
  5. Mix dry ingredients first.Turn sand and cement together until the colour is completely uniform, with no streaks. Uneven mixing gives patchy strength and patchy colour.
  6. Add water gradually.A depression in the middle, water in, fold the dry material in from the edges. Adding too much water at once is very hard to correct.
  7. Aim for the right consistency.It should hold a ridge when you draw the shovel through it, and stay on a trowel held at an angle without running. Too wet and it slumps out of the joint.
  8. Add plasticiser rather than washing-up liquid.Proper mortar plasticiser entrains air and improves workability and frost resistance. Washing-up liquid is a persistent myth and weakens the mix.
  9. Mix only what you can use.Mortar starts to go off within about two hours, less in hot weather. Retempering with more water after it has begun to set severely weakens it.
  10. Match colour on repairs.Sand colour drives mortar colour. Take a sample of the existing mortar to a builders merchant, and make a test batch — it dries much lighter than it looks wet.
  11. Protect it while it cures.Cover new work in hot sun, heavy rain or frost. Mortar that freezes before it sets is permanently weakened.

Tips

  • Mortar should always be weaker than the brick. Stronger mixes damage old brickwork.
  • It dries much lighter than it looks wet — always make a test batch for repairs.
  • Never use washing-up liquid as a plasticiser. Buy the proper additive.

Common mistakes

  • Using a strong cement mix on old soft brick — The mortar becomes harder than the brick, so movement and moisture are forced through the brick face instead of the joint. The faces then spall off and the damage is irreversible.
  • Adding water to mortar that has started to stiffen — Retempering after the cement has begun hydrating breaks the developing structure and substantially reduces final strength. Mix smaller batches instead.

If it doesn't work

Mortar too wet and slumping

Cause: Water added too fast — Fix: Add more dry mix in the same ratio. Do not simply add cement, which changes the strength.

Mix harsh and hard to work

Cause: Sharp sand instead of soft building sand — Fix: Use soft building sand for pointing and bricklaying, and add plasticiser.

New pointing a different colour

Cause: Different sand, and drying shade — Fix: Test batches with different sands, and judge only when fully dry.

Mortar crumbling after a few weeks

Cause: Too weak, frozen, or dried too fast — Fix: Rake out and redo, protecting the work while it cures.

White bloom on new mortar

Cause: Efflorescence — salts drawn out as it dries — Fix: Brush off dry once it stops appearing. Do not wash it in, which drives the salts back.

Questions people ask

What ratio should I use for pointing?

Around 4:1 sand to cement for modern brickwork. For soft older brick, a weaker 5:1 or 6:1 with added lime, or a proper lime mortar for pre-1919 solid walls.

Can I use washing-up liquid as plasticiser?

No. It is a persistent myth. It introduces uncontrolled air and weakens the mix. Proper mortar plasticiser is inexpensive and does the job correctly.

How long does mixed mortar last?

Around two hours, less in hot weather. Once it starts stiffening, adding water to revive it seriously weakens the final result.

Want the whole subject?

  • Renovation Calculator (in development)

    Working out how much sand and cement a given area of brickwork or pointing needs is exactly the sort of quantity calculation the Renovation Calculator handles.

Written and maintained by the GuideHQ editorial team. More in Home & DIY.