Short answer

Wait until the plaster is fully dry all the way through — an even pale colour with no darker patches, which typically means weeks rather than days depending on conditions. Then prime it. But first ask whether the skim should be tiled at all: a skim coat is a thin decorative layer with a real weight limit, and heavy tiles or a wet area want boarding instead.

Two separate questions get tangled together here. One is drying: adhesive stuck to damp plaster and grout over a wall still giving up moisture is a bond problem. The other is more fundamental — whether a thin finish skim is the right thing to hang a tiled wall on at all, which depends on the weight and on whether the wall gets wet.

Step by step

  1. Ask first whether the skim should be tiled.Finish plaster is a few millimetres of relatively soft material bonded to what is behind it. There is a stated maximum tile weight per square metre for plaster backgrounds, and it is much lower than for backer board or masonry. Heavy tiles want the skim off, not tiles on.
  2. In a shower or wet area, do not tile onto skim at all.Plaster and water is a losing combination regardless of what is over it. That area wants a suitable board and a tanking membrane.
  3. Judge dryness by colour, not by the calendar.Fresh plaster is dark; it goes an even pale pink or off-white when dry. Any patch that is still darker is still wet, and the last patches are usually at the bottom and in corners.
  4. Give it far longer than it looks like it needs.The surface dries within days and the body takes much longer, and it depends entirely on thickness, temperature, humidity and ventilation. Cold damp conditions can double or triple it.
  5. Help it dry with ventilation and gentle warmth.Air movement and moderate heat. Not a blast of heat at the wall, which dries the surface and traps moisture behind, and can craze the finish.
  6. Check for suction before tiling.Flick water on. New plaster will drink it instantly, which is exactly what pulls the water out of tile adhesive and leaves a chalky bed.
  7. Prime with the adhesive maker's primer, not PVA.Acrylic tile primer controls suction without forming a layer that can soften again when it gets damp.
  8. Do not polish or over-trowel a wall you intend to tile.A highly polished plaster surface is less absorbent and gives less key. If you know it is going to be tiled, a slightly less polished finish is better.
  9. Use a flexible adhesive and follow the data sheet.Plaster is a background with its own requirements and adhesives state which backgrounds they suit.

Tips

  • If you are planning tiling before the plasterer arrives, tell them — they may leave the area unskimmed or apply a coat suited to tiling, which is a better outcome than skimming and then removing it.
  • A moisture meter gives you a number, but interpreting it against the plaster type takes experience. The colour test plus generous patience is what most people should use.
  • Bathrooms and kitchens dry more slowly than the rest of the house because of the humidity in them — ventilate hard while it dries.
  • Do not mist coat a wall you are going to tile. Paint under adhesive is a bond line you did not need.

Common mistakes

  • Tiling onto plaster that is still damp — Moisture leaving the wall has to go somewhere. With tiles over it, it collects at the bond line, and a cement adhesive that never had a chance to cure properly against a wet background gives a weak bond that can fail months or years later.
  • Tiling heavy tiles onto a skim coat — The skim is only bonded to what is behind it and there is a real weight limit for plaster backgrounds. Exceed it and the failure is not one tile — it is the skim letting go and the whole area coming off in a sheet.
  • PVAing new plaster before tiling — General-purpose PVA can re-emulsify when damp, so it becomes the weakest layer in the build-up precisely where moisture will reach it. Adhesive manufacturers specify their own primers for this reason.

Questions people ask

Is there a rule of thumb for drying time?

The commonly quoted figures assume normal room temperature and reasonable ventilation, and they vary a lot with thickness and conditions, so use the colour of the plaster rather than a number. An evenly pale wall with no darker patches anywhere, including behind radiators and in corners, is the test that matters.

Can I tile onto bonding coat instead of finish plaster?

A bonding or backing coat is a better background for tiling than a polished finish skim, since it is thicker, stronger and keyed. If the wall is being prepared specifically for tiles, leaving it at the backing coat stage is often the sensible plan.

What about tiling onto new plasterboard that has not been skimmed?

That is generally the better option — the board can be tiled directly, with the right primer and within the board's tile weight limit, and there is no skim to add a weak layer. In a wet area, the board type and the tanking still apply.